Inspection History Details
Inspection Status: Canceled
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/10/2025 | BULD - Electrical Clearance | Canceled | 1/10/25 canceled by contractor | |
| 01/23/2025 | BULD - Electrical Clearance | Passed | Approved solar with powerwall 3 - DGC/BAT Clearance to TEP is required for the solar meter | |
| 12/23/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla meter adapter and 175A derate - DGL Clearance was called into TEP Pending solar |