Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/28/2025 | BULD - Electrical Clearance | Passed | Install per code, grounding and bonding present. Clearance INCR Called Roman 1/28/25 9:51 to restore power | |
| 12/12/2024 | BULD - Electrical Clearance | Passed | Approved 200A service panel upgrade - INCR Clearance to TEP is required for the cutover Note: Existing illegal panel upgrade is already connected, TEP is aware. Pending solar under separate permit |