Inspection History Details
Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/07/2025 | BULD - Electrical Clearance | Re-inspection required | 07 FEB 25 Not ready. No response from Contractors. Voicemail was left. |
|
| 02/10/2025 | BULD - Electrical Clearance | Passed | 10 FEB 25 TEP Clearance: INCR, meter was not pulled customer had a disconnect after the meter to shutdown power and reconnect. |