Inspection Status: Passed

Inspection History: COT - RSOL - Electrical Final Solar Project

Date Description Inspector Results Comments
06/30/2025 COT - RSOL - Electrical Final Solar Project Passed 6.30.25
PV system is installed per plans. Proper sized conductors used throughout. Labels on equipment faces and conduits. Grounding and neutrals verified. DGC final CLEARANCE.