Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/30/2025 | BULD - Electrical Clearance | Passed | 6.30.25 PV system is installed per plans. Proper sized conductors used throughout. Labels on equipment faces and conduits. Grounding and neutrals verified. DGC final CLEARANCE. |