Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/15/2024 | BULD - Electrical Clearance | Partial Pass | Bonding and grounding per code CLEARANCE INCR gave verbal to TEP onsite Partial pass pending solar |
|
| 12/11/2024 | BULD - Electrical Clearance | Passed | 12/11/24 TEP clearance Code: DGL | |
| 12/20/2024 | BULD - Electrical Clearance | Passed | Approved solar with power wall 3 - DGC/BAT Clearance to TEP is required for the solar meter |