Inspection Status: Passed

Inspection History: COT - RSPL - Gas Pressure Test 

Date Description Inspector Results Comments
01/12/2026 COT - RSPL - Gas Pressure Test  Passed 01/12/2026
Holding under test.
07/21/2025 COT - RSPL - Gas Pressure Test  Re-inspection required 7/21/25: receptacle spacing none code compliance, Seal all penetrations through top plates, metallic boxes must all be grounded, NM cable shall not be embedded in masonry, concrete or similar unless it is in a raceway, mechanical registers require blocking on three sides, fire block required at all soffit areas, revision required for gas piping, tub/shower must be tested, nail plates required where plumbing/ electrical/ mechanical come within 1 1/4" of face of 2x. STOPPED INSPECTION MORE ITEMS MAY BE ADDED.
08/07/2025 COT - RSPL - Gas Pressure Test  Not Ready NM cable shall not be embedded in masonry, concrete or similar unless it is in a raceway. Deep clean all surfaces and repaint or seal surfaces due to smoke smell from home. Double top plates need to be continuous in master bedroom. Above header in master bedroom. Straps are required at top plate to tie into interior wall. East end of bedroom. Screen room top plates need to be secured with straps. East end wall. Nailing not per schedule at exterior East end. DWV not under test. Stand pipe at laundry room needs to be 18” minimum. Exhaust fan not in place at laundry room. Water heater discharge pipe not rated and cannot terminate into drain pipe. Provide hurricane ties at north of home. Along with interior bearing points. Cut wire north of home in fist bedroom. Add blocking thats been removed near drop for drywall. Furred out bottom strip need to be pressure treated. Ground screws missing throughout. Gas lines need to be submitted to the city. Shading is required underneath polyethylene pipe. 18” to the top of pipe. Remove all old electrical wiring. Throughout. Both showers were on test at time of inspection. 8/7/2025