Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/12/2026 | RSBU - Building Final | Re-inspection required | 01/12/2026 Verified received revision and performed final walkthrough. Complete air register blocking in great room. Lath/vapor barrier and complete stucco east side of house prior to calling in building final. |
|
| 01/26/2026 | RSBU - Building Final | Re-inspection required | 1-26-26: cut clean outs to grade and paint or seal all wood (fascia, columns, roof sheathing at overhangs). | |
| 02/27/2026 | RSBU - Building Final | Passed | 2-27-26: building final approved. |