Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Re-inspection required

Inspection History: COT - RSME - Mechanical Final 

Date Description Inspector Results Comments
01/12/2026 COT - RSME - Mechanical Final  Re-inspection required 01/12/2026
Verified received revision and performed final walkthrough. Complete air register blocking in great room. Lath/vapor barrier and complete stucco east side of house prior to calling in building final.
01/26/2026 COT - RSME - Mechanical Final  Passed 1-26-26: approved.
11/24/2025 COT - RSME - Mechanical Final  Re-inspection required 11-24-25: residential intermediates approved-okay to tape & texture drywall.
Note: pending RFI approval-Original plans call for 1" block iron pipe or pro-flex corregated stainless steel. Current gas set up is 1" to 3/4" proflex. We will require the RFI approved prior to Building Final.