Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Passed

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
01/12/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 01/12/2026
Verified revision received into the city.
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Not Ready
07/21/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 7/21/25: receptacle spacing none code compliance, Seal all penetrations through top plates, metallic boxes must all be grounded, NM cable shall not be embedded in masonry, concrete or similar unless it is in a raceway, mechanical registers require blocking on three sides, fire block required at all soffit areas, revision required for gas piping, tub/shower must be tested, nail plates required where plumbing/ electrical/ mechanical come within 1 1/4" of face of 2x. STOPPED INSPECTION MORE ITEMS MAY BE ADDED.
08/07/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Not Ready NM cable shall not be embedded in masonry, concrete or similar unless it is in a raceway. Deep clean all surfaces and repaint or seal surfaces due to smoke smell from home. Double top plates need to be continuous in master bedroom. Above header in master bedroom. Straps are required at top plate to tie into interior wall. East end of bedroom. Screen room top plates need to be secured with straps. East end wall. Nailing not per schedule at exterior East end. DWV not under test. Stand pipe at laundry room needs to be 18” minimum. Exhaust fan not in place at laundry room. Water heater discharge pipe not rated and cannot terminate into drain pipe. Provide hurricane ties at north of home. Along with interior bearing points. Cut wire north of home in fist bedroom. Add blocking thats been removed near drop for drywall. Furred out bottom strip need to be pressure treated. Ground screws missing throughout. Gas lines need to be submitted to the city. Shading is required underneath polyethylene pipe. 18” to the top of pipe. Remove all old electrical wiring. Throughout. Both showers were on test at time of inspection. 8/7/2025
09/09/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Partial Pass 9-9-25: per contractor, a revision to the city regarding the gas has been submitted. Original plans call for 1" block iron pipe or pro-flex corregated stainless steel. Current gas set up is 1" to 3/4" proflex. Secure registers at bedroom east of dining room, Add shot pins sill plate at bedroom fur out and install a pressure treated 2x4 stud at the northwest corner of the pantry behind kitchen wall and add a 2x4 at the soffit housing the metal duct between the master suite and pantry. Okay to continue with construction at progress areas but an inspection of the mentioned items requiring correction must be inspected prior to covering areas.
11/14/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Partial Pass 11-14-25: Corrections made, however, Original plans call for 1" block iron pipe or pro-flex corregated stainless steel. Per contractor, a revision showing change has been submitted to,the city for review-Current gas set up is 1" to 3/4" proflex. Okay to continue with insulation & drywall at own risk. Also, call for a drywall screw inspection prior to tape & texture.
11/24/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Partial Pass 11-24-25: residential intermediates approved-okay to tape & texture drywall.
Note: pending RFI approval-Original plans call for 1" block iron pipe or pro-flex corregated stainless steel. Current gas set up is 1" to 3/4" proflex. We will require the RFI approved prior to Building Final.