Inspection Status: Canceled

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
01/29/2025 BULD - Electrical Clearance Canceled canceled by John
02/05/2025 BULD - Electrical Clearance Passed 05 FEB 25
TEP CLEARANCE: BAT, called in at 12:14.
02/21/2025 BULD - Electrical Clearance Passed Approved battery powerwall battery installation to existing solar, previous inspection should have been cleared for the line-side tap (DGL) - DGC/DGL/BAT clearance to TEP
04/28/2025 BULD - Electrical Clearance Passed Approved meter can correction per TEP - RECN Clearance was called into TEP
The solar with battery was not changed - existing DGC/DGL/BAT Clearance to TEP applies