Inspection History Details
Inspection Status: Canceled
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/29/2025 | BULD - Electrical Clearance | Canceled | canceled by John | |
| 02/05/2025 | BULD - Electrical Clearance | Passed | 05 FEB 25 TEP CLEARANCE: BAT, called in at 12:14. |
|
| 02/21/2025 | BULD - Electrical Clearance | Passed | Approved battery powerwall battery installation to existing solar, previous inspection should have been cleared for the line-side tap (DGL) - DGC/DGL/BAT clearance to TEP | |
| 04/28/2025 | BULD - Electrical Clearance | Passed | Approved meter can correction per TEP - RECN Clearance was called into TEP The solar with battery was not changed - existing DGC/DGL/BAT Clearance to TEP applies |