Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSME - Mechanical Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/26/2024 | COT - RSME - Mechanical Final | Re-inspection required | 9/26/24: properly identify if package unit has a heat kit installed to properly determine max fuse size, uv coat condensate drain, B-Vent requires 1" clearance from combustibles. | |
| 10/04/2024 | COT - RSME - Mechanical Final | Re-inspection required | 10/4/24 fuse wrong size at disconnect for ac unit | |
| 10/08/2024 | COT - RSME - Mechanical Final | Passed | 9/26/24: properly identify if package unit has a heat kit installed to properly determine max fuse size, uv coat condensate drain, B-Vent requires 1" clearance from combustibles. 10/4/24 fuse wrong size at disconnect for ac unit 10/8/24: corrections made |