Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - RSPL - Plumbing FinalĀ
| Date |
Description |
Inspector |
Results |
Comments |
| 08/13/2025 |
COT - RSPL - Plumbing FinalĀ |
|
Re-inspection required |
All clean outs need to be cut to grade along with proper caps. Exterior plastic pipes need to be coated. Insulate water lines. Provide a minimum of 3/4" pipe for discharge at water heater. 8/13/2025 |