Inspection Status: Passed
Inspection History: COT - RSBU - Excavation/Rebar/Zoning
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/27/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 2-27-26: approved. | |
| 03/25/2025 | COT - RSBU - Excavation/Rebar/Zoning | Partial Pass | 3-25-25, setbacks verified as per plans.Exvavation/reinforcement for footings changed from mono pour to a stem wall. Revisions have been submitted to the city for review. Footing depth/width is 20x20 with #4 rebar horizontal and verticals at 24" o.c... Okay to pour at own risk. Note: UFER not in place. However, contractor will provide photos prior to pouring and will later be verified at inspection. |
|
| 04/04/2025 | COT - RSBU - Excavation/Rebar/Zoning | Partial Pass | Stem wall approved throughout all build. Bond beam in place, bolts at every 32" and a total of 6 hold downs STHD 10. Okay to grout progress areas. 4/4/2025 |