Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: RSBU - Building Final
| Date |
Description |
Inspector |
Results |
Comments |
| 02/24/2026 |
RSBU - Building Final |
|
Not Ready |
|
| 02/27/2026 |
RSBU - Building Final |
|
Re-inspection required |
2-27-26: corrections made from inspection dates 2/24/26, however, there are corrections required for the following items: install bubble covers at all exterior receptacles that are not under cover (covers must be rated "heavy duty" while in use), paint exterior plastics/elbows adjacent to condenser, wrap hose bib with R3 insulation. Have a licensed contractor submit a letter for interior shear bracing inspection. Document that drywall/drywall screws were installed per plans and meet the 2018 IRC. Schedule remaining inspections & provide any pictures/videos for main water line to verify that it was under test with proper depth of trench & that tracer wire was in place together with trench having been backfilled with required shading materials. Otherwise, main water line must be exposed to verify listed above requirements. |
| 03/03/2026 |
RSBU - Building Final |
|
Passed |
|
| 03/21/2025 |
RSBU - Building Final |
|
Canceled |
3/21/25: canceled by Enayat |