Inspection Status: Passed
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 02/27/2026 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
2-27-26: previously inspected & approved by J.Burge. |
| 08/19/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Partial Pass |
8/19/25: Lath approved |
| 09/18/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Not Ready |
9/18/2025 inspection was only for plumbing intermediate. Bracing required throughout. Provide nail plate at shower head first floor. Bracing required every 32" for pex running horizontally. Leak at laundry room. Leak at casita marked areas. Dry all wet areas to finish conducting the inspection. |
| 09/22/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
Ok to insulate and sheet rock throughout. |