Inspection History Details
Inspection Status: Passed
Inspection History: RSBU - Building FinalĀ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/26/2025 | RSBU - Building FinalĀ | Passed | 6.26.26 Solar system is installed as per plans. Correct conductors verified. Schedule verified. Proper grounding and bonding verified. Neutrals verified. Labeling on conduit verified every 10 ft. Address label present. Proper labels and warnings verified throughout. |