Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/29/2025 | BULD - Electrical Clearance | Passed | Approved 200A service panel upgrade - INCR Clearance to TEP is required for the electrical cutover Solar underground separate permit |
|
| 02/13/2025 | BULD - Electrical Clearance | Re-inspection required | 13 FEB 25 1. Not Ready, plans are not attached. |
|
| 02/19/2025 | BULD - Electrical Clearance | Not Applicable |