Inspection Status: Passed

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
01/29/2025 BULD - Electrical Clearance Passed Approved 200A service panel upgrade - INCR Clearance to TEP is required for the electrical cutover
Solar underground separate permit
02/13/2025 BULD - Electrical Clearance Re-inspection required 13 FEB 25
1. Not Ready, plans are not attached.
02/19/2025 BULD - Electrical Clearance Not Applicable