Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/07/2025 | BULD - Electrical Clearance | Passed | 3/7/25 approval for TEP DGL | |
| 03/13/2025 | BULD - Electrical Clearance | Passed | Passed 3/11/25 CLEARANCE DGC | |
| 10/18/2024 | BULD - Electrical Clearance | Not Ready | NOT READY. Technician Cesar will be presenting a photo of the main house panel, to his company, for further evaluation. This panel appears to be an overloaded 60 amp panel , for acceptance of the solar. The present PV double breaker is in the wrong location, being next to the main disconnect. |