Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-RES-0924-05126
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/02/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Missing h25 at jack truss back entry and double girder trusses throughout. Add fha plate at kitchen hood. Add nail plates to pipes and electrical lines that are less than an 1 1/4" from face of 2x. Secure pex lines throughout every 32". Add ground screws to metal boxes. Drain for laundry is creating an S trap. 6/2/2025 | |
| 06/03/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Missing h25 at jack truss back entry and double girder trusses throughout. Add fha plate at kitchen hood. Add nail plates to pipes and electrical lines that are less than an 1 1/4" from face of 2x. Secure pex lines throughout every 32". Add ground screws to metal boxes. Drain for laundry is creating an S trap. 6/2/2025 6.3.25:FHA plate required at kitchen hood vent, nail plate required at bathroom south east corner (marked with a red x), thermostat shall be no higher than 48" above finish floor. |
|
| 06/06/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed |