Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/22/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Called and received no response. Got to the site and no response as well. Need access to the site. 11/22/2023 | |
| 11/28/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Called and received no response. Got to the site and no response as well. Need access to the site. 11/22/2023 11/28/23: H2.5 clips called at each stud top and bottom plate per plan, blocking at mid point missing, anchor bolts missing 12" from edge at existing bottom plate, replaced bottom plate requires 2 anchor bolts if bottom plate is larger than 12". |
|
| 12/06/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ok for drywall |