Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 11/28/2023 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
Add blocking corner of living room area. Add blocking at verticals ever 10'. Add two king studs and straps at SGD. Move smoke detectors over 6" from top and side walls. Add anchor bolts at edges of bottom plates and at 48". Provide 18" of copper before transitioning to pex at water heater. Add three way switch at living room. Add exhaust fan is laundry room. 11/28/2023 |
| 12/01/2023 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
12/1/23: all corrections made |