Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/29/2024 | BULD - Electrical Clearance | Passed | Partial for the 60A meter adapter, DGL Clearance was called into TEP at 11:00am Pending solar |
|
| 05/31/2024 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance to TEP is required for the solar meter |