Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - RSPL - Rough SoilÂ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/09/2024 | COT - RSPL - Rough Soil | Partial Pass | 2/7/24: wet soil conditions (inspection must be re-scheduled) 2/9/24: plumbing underground per plan ok to backfill. Shading required. revision will need to be made to show actual run and connection of grey water and sewer. |