Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/11/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | 2/11/25 not ready, DWV not under test, fire foam needed at penetrations, blocking needed at hvac registers, staples needed at electrical receptacles. Insulation needed needed at receptacles at firewall. Stopped inspection. | |
| 02/18/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 2/11/25 not ready, DWV not under test, fire foam needed at penetrations, blocking needed at hvac registers, staples needed at electrical receptacles. Insulation needed needed at receptacles at firewall. Stopped inspection. 2/18/25: no access to site. Arrived on site at 10:20AM. Called Alex Paz, phone number: (520) 208-4882 at 10:21am no answer. Waited on site for 15 minutes. No answer/no access. |
|
| 02/20/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 2/11/25 not ready, DWV not under test, fire foam needed at penetrations, blocking needed at hvac registers, staples needed at electrical receptacles. Insulation needed needed at receptacles at firewall. Stopped inspection. 2/18/25: no access to site. Arrived on site at 10:20AM. Called Alex Paz, phone number: (520) 208-4882 at 10:21am no answer. Waited on site for 15 minutes. No answer/no access. 2/20/25: Cleanouts missing throughout, Grey water missing per plans, properly secure romex 8" from boxes, DWV not under test, standpipe for washer non code compliance, seal all penetrations throughout. |
|
| 02/25/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | OK to insulate and sheet rock interior walls. |