Inspection Status: Not Ready
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 11/03/2026 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Not Ready |
Fire foam all top penetrations. Seal all exterior penetrations. Secure wires in place at marked areas. Provide correct wire for encasing of stucco over wall. Provide nail plates at marked areas. Provide listed supports/ bracing for feeders overhead and vertically. Ensure disconnect is off to the side of condenser unit. 11/3/2026 |
| 11/06/2026 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
11-6-26 all other items have been corrected still requires Fire foam at all top penetrations. Seal all exterior penetrations. Missing fire foam at top plate in exterior penetration at Northwest corner. Reinspect is required |
| 11/09/2026 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
|