Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/08/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 1. Kitchen countertop receptacles will require proper spacing per 2023 NEC, all kitchen receptacles will need to be on a GFCI to include the Range. 2. For your building final, you will need a carbon monoxide detector in the immediate vicinity of all the bedrooms. 3. Each vanity in the bathroom will require a GFCI receptacle 4. Copper pipe in hallway bathroom was spraying water due to a score in the pipe done with a pipe cutter; please dry or replace any damaged materials prior to next inspection. 5. At final, Water hammer arrestors will be needed at dishwasher, ice makers, and washers. |