Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSPL - Plumbing Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/18/2026 | COT - RSPL - Plumbing Final | Re-inspection required | Not under pressure, set to 15 psi | |
| 09/24/2026 | COT - RSPL - Plumbing Final | Re-inspection required | 09/24/2026 Plans call for PE line underground and not metal for the full run. Metal anodeless riser with factory-applied coating is adequate for risers, see IRC 2024 G2415.11.2 for details. |
|
| 10/02/2026 | COT - RSPL - Plumbing Final | Passed | 10/02/2026 Holding under test. |