Inspection Status: Partial Pass
Inspection History: RSBU - Building Progress
| Date |
Description |
Inspector |
Results |
Comments |
| 01/26/2026 |
RSBU - Building Progress |
|
Partial Pass |
Inspection call for construction meeting |
| 02/03/2026 |
RSBU - Building Progress |
|
Not Ready |
Please recall inspection after special inspection is completed |
| 02/18/2026 |
RSBU - Building Progress |
|
Not Ready |
inspection call for intermediate two window openings. Do not have trimmer king stud arrangement on header properly and opening for slider to backyard needs tohave double king double trimmers. grounds need to be made up on all metal boxes prior to trim. |
| 02/20/2026 |
RSBU - Building Progress |
|
Re-inspection required |
no current plans on site |
| 02/26/2026 |
RSBU - Building Progress |
|
Partial Pass |
|
| 03/03/2026 |
RSBU - Building Progress |
|
Passed |
Inspection call for drywall nailing OK to proceed |
| 12/12/2025 |
RSBU - Building Progress |
|
Not Ready |
Inspection called for pre-con meeting |
| 12/16/2025 |
RSBU - Building Progress |
|
Partial Pass |
rough soil leak check good, partial approval for interior post tension repair and ok to place concrete for shower pan. please upload paperwork on portal. |
| 12/19/2025 |
RSBU - Building Progress |
|
Partial Pass |
partial pass for shower pan |