Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Preslab
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/20/2026 | COT - RSBU - Preslab | Re-inspection required | 1-Obtain UG plumbing approval. 2-Wrap piping in concrete. 3-Install hold downs. |
|
| 03/02/2026 | COT - RSBU - Preslab | Passed | Passed 3/2/26 |