Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Re-inspection required

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
09/23/2025 BULD - Electrical Clearance Re-inspection required 9.23.2025
Need metal address tag with unit number on front of main panel, wires need to be secured and terminated into service panel, copper grounding wires need to be bonded and secured to panel at lugs.
10/24/2025 BULD - Electrical Clearance Passed 10/24/2025 clearance for TEP INCR. UNIT #2.