Inspection History Details
Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/23/2025 | BULD - Electrical Clearance | Re-inspection required | 9.23.2025 Need metal address tag with unit number on front of main panel, wires need to be secured and terminated into service panel, copper grounding wires need to be bonded and secured to panel at lugs. |
|
| 10/24/2025 | BULD - Electrical Clearance | Passed | 10/24/2025 clearance for TEP INCR. UNIT #2. |