Inspection History Details
Inspection Status: Canceled
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/17/2025 | BULD - Electrical Clearance | Canceled | ||
| 09/18/2025 | BULD - Electrical Clearance | Canceled | Talked to Jose, we will need tech to be onsite. All solar inspections are done virtually. We also need the plans attached to the permit. | |
| 10/01/2025 | BULD - Electrical Clearance | Passed | 10.01.2025 Clearance to TEP DGC. |