Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/01/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the tesla meter adapter and 175A derate - DGL Clearance was called into TEP Pending solar |
|
| 11/21/2024 | BULD - Electrical Clearance | Passed | Installed per plans, grounding, bonding, and labels per code, CLEARANCE DGC 11/21/24 |