Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/12/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla meter adapter, DGL Clearance was called into TEP Pending solar |
|
| 03/20/2025 | BULD - Electrical Clearance | Passed | Passed 3/20/25 CLEARANCE DGC/BAT | |
| 11/04/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A service panel upgrade - INCR Clearance was called into TEP Pending solar |