Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/19/2025 | RSBU - Building Final | Re-inspection required | 2/11/25 Electrical. It's be run through conduit for covered patio. Paint or stain needed on covered patio. 2/19/25: metal conduit shall be supported within 3ft of a receptacle box, receptacles must be Weather resistant. |
|
| 02/11/2025 | RSBU - Building Final | Not Ready | 2/11/25 Electrical. It's be run through conduit for covered patio. Paint or stain needed on covered patio. | |
| 02/20/2025 | RSBU - Building Final | Passed |