Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/30/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the meter adapter - DGL Clearance to TEP is required Pending solar |
|
| 11/13/2024 | BULD - Electrical Clearance | Passed | Approved solar and powerwall - DGC/BAT Clearance to TEP is required for the solar meter and battery |