Inspection History Details
Inspection Status: Canceled
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/13/2025 | BULD - Electrical Clearance | Canceled | duplicate | |
| 03/13/2025 | BULD - Electrical Clearance | Not Ready | ||
| 06/20/2025 | BULD - Electrical Clearance | Passed | 6.20.25 DGC code. Solar installed per plan, proper wire gauges verified, lugs torqued, tied in per plans. Labeling verified, bond bushings/grounding verified, address listed on panel, panels grounded on roof, wires tight and secured. | |
| 06/20/2025 | BULD - Electrical Clearance | Passed | 6.20.25 DGC code. Solar installed per plan, proper wire gauges verified, lugs torqued, tied in per plans. Labeling verified, bond bushings/grounding verified, address listed on panel, panels grounded on roof, wires tight and secured. | |
| 11/19/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A service panel upgrade - INCR Clearance to TEP is required for the cutover Pending Solar |