Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date |
Description |
Inspector |
Results |
Comments |
| 10/30/2024 |
BULD - Electrical Clearance |
|
Re-inspection required |
Meter socket adapter had wrong size breaker, must be 60amp 10/30/24 |
| 11/21/2024 |
BULD - Electrical Clearance |
|
Passed |
Correct meter socket installed 11/21/24 Clearance DGL gave verbal for reconnect |
| 11/25/2024 |
BULD - Electrical Clearance |
|
Passed |
Approved - DGC Clearance to EP is required for the solar meter |