Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSEL - Outdoor Lighting
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/25/2025 | COT - RSEL - Outdoor Lighting | Re-inspection required | 25 March 25 1. Exterior outlets need to be WR rated. 2. Lighting exterior needs covers 3. Sheet rock needs to be installed. |
|
| 04/24/2025 | COT - RSEL - Outdoor Lighting | Passed | 4/24/2025. Approved. Corrections were made. |