Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TC-RES-0824-04833

Parcel: 119034260


Addresses:

513 W 43RD ST

Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
02/20/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 2/20/25: Seal all penetrations through top plate and vapor barrier, DWV not under pressure, shower and tub not under pressure, 4" dryer vent exhaust must be sealed, lath not complete, Grey water missing per plans, wrap copper piping stubbing out of lath with 10 mil tape for protection against stucco, blocking required at back side of main panels for fire block, properly secure washer box.
02/21/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Not Ready DWV not under tesr, move wires over gusset plates so they are not on plates. Straps required on vent lines, foam in penetrations to top plate.
02/24/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 2-24-25, DWV not under test. Add strapping to condensate lines in each unit, insulate or block any can lights within 1 foot of pex lines. Reschedule inspection when ready.
02/26/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 2/26/25 corrections made