Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/14/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the riser correction per TEP - RECN Clearance was called into TEP Pending Solar Final -NR |
|
| 01/21/2025 | BULD - Electrical Clearance | Passed | Installed per plans, wiring and labels proper CLEARANCE DGC/BAT | |
| 12/04/2024 | BULD - Electrical Clearance | Partial Pass | 12/4/24 TEP clearance: INCR. partial pass, DGC will be required later. called TEP at 10:53 |