Inspection History Details
Inspection Status: Canceled
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/16/2024 | BULD - Electrical Clearance | Canceled | CANCELED per Erick. | |
| 11/06/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the tesla meter collar - DGL Clearance was called into TEP Pending solar |
|
| 11/08/2024 | BULD - Electrical Clearance | Passed | Installation, bonding, and labeling per plans, wiring per schedule, passed final 11/8/24 CLEARANCE DGC/BAT |