Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/20/2025 | BULD - Electrical Clearance | Passed | Approved for electrical reconnection - RECN clearance to TEP is required for unit #205 (meter #164592662) |