Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - RSPL - Rough Soil
| Date |
Description |
Inspector |
Results |
Comments |
| 10/31/2025 |
COT - RSPL - Rough Soil |
|
Re-inspection required |
10-31-25: vent was laying on soil-properly secure vent vertically. The entire drain and waste system must be tested by means of a static water test to 5’ above highest fittings. |
| 11/03/2025 |
COT - RSPL - Rough Soil |
|
Passed |
11-3-25: underground plumbing approved. Okay to backfill with shading materials. |