Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 02/28/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
2-28-25, firefoam all penetrations at top plates, add strapping to condensate lines together with strapping to mini split whips. Block or insulate all pex lines within 12 inches of can lights. Gas pressure test was inspected and approved by TG on 2-14-25. |
| 03/04/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
|
| 10/11/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Not Ready |
Called for electrical underground, added inspection |
| 12/20/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
12-20-24, not ready. Customer is currently at the framing phase of construction. However, framing inspection could not be done because it's not ready and the roof system has not been installed. Customer will reschedule exterior clips/sheathing and roof inspection when ready. |