Inspection Status: Re-inspection required

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
08/18/2025 BULD - Electrical Clearance Re-inspection required 8-15-25: approved stamped plans are required to be on site. Reschedule when ready.
08/19/2025 BULD - Electrical Clearance Re-inspection required install two straps between service and roof.
08/29/2025 BULD - Electrical Clearance Re-inspection required 8/29/25
Main panel Busbar showing signs of fire damage, meter socket looks corroded. Need 2 suppport straps on riser under roof. Recommend replacing panel.
09/16/2025 BULD - Electrical Clearance Passed 9/16/25 corrections made, CLEARANCE INCR FOR NEW PANEL