Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/18/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 8-15-25: approved stamped plans are required to be on site. Reschedule when ready. | |
| 08/19/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 1-Fire block per Code. 2- Finish all framing and furr-outs per Code. 3-No test on piping. 4-Provide evaluation for bearing header notched between carport and dining room. 5-Shim rafters at bearing on West wall. inspection stopped; may be more corrections when approved plans are on site. |
|
| 08/29/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Partial Pass | 1.Partial pass, plumbing not under test 2. Seal all top plates with fire foam 3. Main service,panel showing fire damage, recommend replacing. 4. Install a 2 support straps under roof for Main panel riser. |
|
| 09/16/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 9/16/25 corrections made, CLEARANCE INCR FOR NEW PANEL |