Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
08/18/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 8-15-25: approved stamped plans are required to be on site. Reschedule when ready.
08/19/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 1-Fire block per Code.
2- Finish all framing and furr-outs per Code.
3-No test on piping.
4-Provide evaluation for bearing header notched between carport and dining room.
5-Shim rafters at bearing on West wall.
inspection stopped; may be more corrections when approved plans are on site.
08/29/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Partial Pass 1.Partial pass, plumbing not under test
2. Seal all top plates with fire foam
3. Main service,panel showing fire damage, recommend replacing.
4. Install a 2 support straps under roof for Main panel riser.
09/16/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 9/16/25 corrections made, CLEARANCE INCR FOR NEW PANEL