Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: COT - RSPL - Rough Soil
| Date |
Description |
Inspector |
Results |
Comments |
| 08/02/2024 |
COT - RSPL - Rough Soil |
|
Passed |
|
| 11/16/2023 |
COT - RSPL - Rough Soil |
|
Re-inspection required |
11/16/23: re-inspection, need 5ft head on plumbing for test, plumbing too close to surface needs to be trenched deeper |
| 11/20/2023 |
COT - RSPL - Rough Soil |
|
Passed |
11/20/23: Plumbing line has been lowered, and still has the proper fall in the line. U/G sewer line has a 5' water head test without any leaks. Okay to shade pipes and backfill trenches. |