Inspection History Details
Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/12/2023 | BULD - Electrical Clearance | Re-inspection required | NR, plans must be revised and approved for the meter can tap TEP was notified to reconnect power, reinspection is required for the line-side tap |
|
| 11/15/2023 | BULD - Electrical Clearance | Partial Pass | Partial for the line-side tap in meter can, DGL Clearance was called into TEP at 10:30am | |
| 11/17/2023 | BULD - Electrical Clearance | Passed | DGC/DGL |