Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/09/2024 | BULD - Electrical Clearance | Passed | Approved service panel upgrade, INCR Clearance to TEP is required for the cutover | |
| 06/25/2024 | BULD - Electrical Clearance | Partial Pass | CLEAR INCR for cutover scheduling. PARTIAL PASS for future solar on this permit. |
|
| 07/16/2024 | BULD - Electrical Clearance | Canceled | CA - cancelled powerkill by TEP | |
| 07/30/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla meter collar to battery, DGL Clearance was called into TEP at 10:05am | |
| 08/15/2024 | BULD - Electrical Clearance | Passed | Approved - DGC/BAT Clearance to TEP is required for the solar meter and battery installation |